4 Days Training Course on Solar Powered Pumping Systems Sustainable Solution for Drinking Water Supply - Focus on Planning, Design, Smart Remote Management & Monitoring, On-site Quality Control and Installation Practices Organized By IPHE, (Bhopal Chapter) with joint Venture with WatsanCAD Solution, Bhopal Venue : Shree Vatika, Smart rooms, Walmi Road, Bhopal Date 28th Sept 2020 to 01st Oct 2020 Click for more Details














Projects

The list of the important assignments carried out in which our members are associated are given below:-

a. Preparation of Detailed Project Report for Group Water Supply Schemes for villages & Towns of Different Districts of Madhya Pradesh including survey & Investigation, Designing, Drawing and preparation of Estimates etc. complete.- Client MP Jal Nigam Maryadit, Bhopal

1. Majholi Group Water Supply Scheme for 31 villages District Sidhi - Estimated cost Rs. 92.00 Crores

2. Bebas - Sonar Group Water Supply Scheme for 80 villages District Damoh - Estimated cost Rs. 168.88 crores

3. Singhsar Group Water Supply Scheme for 76 villages District Panna - Estimated cost Rs. 128.70 crores

4. Karanpura Group Water Supply Scheme for 40 villages District Umariya - Estimated cost Rs. 73.54 crores

5. Singhoura Group Water Supply Scheme for 84 villages District Panna - Estimated cost Rs. 135.89 crores.

b. Planning & designing of development works and services (planning, designs, estimation of Roads, Surface drains, street lighting, Sewer network, Water supply system etc.) for Polytechnic Complexes at Jagdalpur & Dhar - Estimated cost Rs. 127.00 Lacs - Time of completion 12 weeks (A World Bank Aided Project) - Client M.P. Housing Board Bhopal.

c. Bhoj Wetland Project - Development of Upper and Lower Lake, Bhopal & its Water sheds. One of the identified wetland in India among seven. This project is being financed external aided funding through (OECF) Japan i.e. project for

(1) Diversion of waste water from water bodies consists of sewer network design i/c trunk & outfall sewers, intermediate pumping stations with wetwell & pumps, treatable studies and UASB treatment plant design - Estimated cost Rs. 110.16 Lacs - Time of completion 8 weeks,

(2) Managements of Dhobi Ghats for lower lake - Estimated cost Rs. 110.00 Lacs - Time of completion 6 weeks,

(3) Solid waste management for upper & lower lake catchment - Estimated cost Rs. 113.00 Lacs - Time of completion 6 weeks etc. - Client M.P. PHED & Municipal Corporation, Bhopal.

(4) Sewerage Network of Bairagarh

d. 30 DPR’s for piped water supply schemes in bigger villages of M.P. special project with assistance under external funding of German Fedral Bank, KfW. These projects including DETAILED ENGINEERING, GEOPHYSICAL & WATER QUALITY Survey, Engineering Design & Drawing of each component with Estimates, Report consists of Executive Summary, Introduction, Details of Existing Water Supply Status & Need of the Project, Source selection discussions based on logical analysis, Project proposals, Financing - Estimated cost Rs. 730.00 Lacs - Time of completion 2 weeks for each DPR etc. - Client M.P. PHED.

e. 8 case studies for pilot project under rehabilitation programme of KfW (GERMANY) phase-I suggestion with optimal solution considering existing field problems. Including DETAILED ENGINEERING Survey FOR DISTRIBUTION NETWORK & PUMPING MAIN CONSIST OF PLAIN TABLING & CHAIN COMPASS. designs & drawings of all component (WATER SUPPLY DISTRIBUTION NETWORK, PUMPING MAIN, PUMPS ETC.) considering existing system, cost estimates, project report, operation maintenance & tariff studies (CONSIDERING SOCIO-ECONOMIC CONDITIONS OF EACH VILLAGE), periodical site supervision & quality control. Estimated cost Rs. 96.00 Lacs - Time of completion 2 weeks For each - Client GKW CONSULT GERMANY.

f. Feasibility Report of Artificial Recharging for ground water in Madhya Pradesh in districts of Rajnandgaon - Estimated cost Rs. 900.00 Lacs - Time of completion 12 weeks and Shajapur - Estimated cost Rs. 1700.00 Lacs - Time of completion 10 weeks- Client M.P. PHED g. River Action Plan for cleaning of rivers of Madhya Pradesh, Betwa - Visidha consist of survey, design of sewer network & UASB treatment plant (7.00 mld capacity) - Estimated cost Rs. 496.00 Lacs - Time of completion 12 weeks - Client M.P. PHED

h. 98 DPR’s for Accelerated Urban Water Supply Programme as per guide lines of Ministry of Urban Affairs Government of India in Madhya Pradesh consist of DETAILED ENGINEERING, GEOPHYSICAL & WATER QUALITY Survey, designs & drawings of all component (RAW water pumps, pumping/gravity mains, clear water pumps, hydraulic design of water treatment plants, water supply networks etc.) considering existing system, cost estimates, project report, operation maintenance & tariff studies - All of these have been cleared by CPHEEO. Estimated cost Rs. 6386.00 Lacs - Client M.P. and C.G. PHED